Construction of a Photovoltaic Installation in Szczecin

Construction of a Photovoltaic Installation in Szczecin

Construction of a photovoltaic installation with a capacity of up to 100 kWp in the area of CR-Dąbska in Szczecin as part of the Regional Operational Program of the West Pomeranian Voivodeship 2014-2020. Priority axis II Low-emission economy. Measure 2.10 Increasing the use of renewable sources.

Project implementation time: Q3 2018 – Q3 2019
Total project value: PLN 781.5 thousand gross PLN, including EU co-financing: 381.9 thousand. PLN

Objective:

  • 95.58 MWhe / year planned electricity production
  • 99.84 kWp planned maximum installed power in photovoltaic modules electricity generated primarily for the needs of the District Heating Dąbska
  • gaining new investment and operating experience in the photovoltaic industry

Effects:

  • increasing the share of energy from renewable sources in the total volume of energy consumed in the voivodeship, and consequently the country
  • no pollutant emissions
  • the operation has no effect on the depletion of fuel, which is used for energy production
  • fuel is free and the cost of energy produced is not dependent on the prices of raw materials