Company: Szczecińska Energetyka Cieplna
Status: completed
Completion time: November 2012 – November 2015
Total project value: PLN 89.7 million
Funding source: funds from the National Fund for Environmental Protection and Water Management under the Infrastructure and Environment Operational Programme, measure 9.2 “Effective energy distribution”

Project objectives:
- increase in security of supply of district heat,
- improving air quality in Szczecin and the region,
- reducing heat energy losses in the distribution process to consumers,
Benefits of the Project:
- improving the quality of life in the city of Szczecin and its immediate surroundings,
- reducing carbon dioxide emissions from Szczecin’s combined heat and power plants by approximately 12,000 tonnes per year,
- reducing the number of district heating failures arising in Szczecin,
Scope of tasks completed:
- reconstruction of worn-out sections of underground (ducted) thermal network with a total length of over 21.2 km, to modern ones in pre-insulated pipe technology,
- replacement of thermal insulation on overhead network sections with a total length of over 6.5 km.