The aim of the project was to build a photovoltaic installation with a capacity of up to 100 kWp at CR-Dąbska in Szczecin as part of the Regional Operational Programme for the West Pomeranian Province 2014-2020. Priority axis II Low-carbon economy. Measure 2.10 Increasing the use of renewable energy sources.
Project completion time: third quarter of 2018 – third quarter of 2019
Total project value: PLN 781,5 thousand gross, including EU funding: PLN 381,900
Project objectives:
- 95.58 MWhe/year planned electricity production,
- 99.84 kWp planned maximum installed capacity of photovoltaic modules,
- electricity generated primarily for the needs of the Dąbska District Heating Plant,
- gaining new investment and operational experience in the photovoltaic sector.
Effects:
- 79.43 t/year – less CO₂
- increase in the share of renewable energy in the volume of total energy consumed on a provincial, and consequently national scale
- no emissions of pollutants,
- action does not affect the depletion of fuel stocks that are used for energy production,
- the fuel is free and the cost of the energy produced is not dependent on the price of raw materials,